A fire protection report is a comprehensibly reasoned expert assessment of an established or planned condition or of a clearly formulated fire protection question. It separates findings, assessment criteria and conclusion and must be verifiable by competent third parties.
Fire protection reports are needed, for example, in building procedures, commercial facility permit procedures, changes of use, conversions or the assessment of existing buildings. Deviations from building law requirements, special uses, special buildings or differing views on the necessary fire protection measures can also be grounds for a report. The competent authority may call in an official expert for this purpose or require the submission of an expert assessment. A report commissioned by the project side is usually referred to as a private expert report.
What does a fire protection report contain?
The exact content depends on the task. The report usually begins with findings that objectively describe the building, its use and the existing or planned condition. These include, among other things, building dimensions, building class, escape level, fire compartments, building materials and components used, escape and rescue routes and existing fire protection installations.
This is followed by the expert assessment. The established facts are compared with the applicable laws, ordinances, standards, guidelines, permit decisions and recognised technical rules. Depending on the question, the following topics may be covered:
- Reaction to fire of building materials and fire resistance of building components
- Formation and separation of fire compartments
- Execution of fire walls, fire doors and firestops
- Length, width, and safe usability of escape routes
- Smoke extraction and keeping areas free of smoke
- Fire alarm, alerting and extinguishing systems
- Firefighting water supply and accessibility for the fire brigade
- Organisational fire protection measures
- Effects of a deviation and possible compensatory measures
The report ends with a summarising conclusion. It answers the technical question posed and, where applicable, records which measures are required to achieve the intended level of protection.
Legal and normative foundations in Austria
Which provisions apply depends on the location, the use and the respective procedure. Austrian building law falls within the competence of the federal provinces. The building codes and building technology ordinances of the respective province therefore form an essential basis. The OIB guidelines declared binding in them specify the technical building requirements. For fire protection, OIB Guideline 2 in particular is relevant, as well as – depending on the building project – guidelines 2.1 for industrial buildings, 2.2 for garages, covered parking spaces and parking decks, and 2.3 for buildings with an escape level of more than 22 metres.
In addition, ÖNORM standards, European standards and the Technical Guidelines for Preventive Fire Protection, TRVB for short, may be used. These regulations are not always directly legally binding. However, their significance can arise from a statutory reference, an official decision, a contractual agreement, the state of the art or the specific technical task. In addition, federal law requirements, for example from trade law or employee protection law, may have to be taken into account.
For complex or performance-based evidence, fire protection engineering methods can also be used. These include, for example, fire and smoke simulations, evacuation calculations or computational analyses of structural behaviour in the event of fire. International standards and methods from ISO, NFPA or SFPE can provide additional foundations for this. In Austria, however, they are not automatically legally binding; their applicability and the assumptions used must be technically justified for the specific project and brought into line with the Austrian protection objectives.
Who is allowed to prepare a fire protection report?
The report should be prepared by a person who has the necessary training, authorisation and demonstrable expertise for the specific task. Depending on the procedure and the subject of the evidence, those who may be considered include in particular suitably authorised civil engineers (Ziviltechniker), engineering firms, generally sworn and court-certified experts, experts from fire prevention offices or official experts appointed by the authorities.
Not every technical statement on fire protection automatically has the status of an expert report. What matters is a clearly formulated task, a complete record of findings, the professional qualifications of the person preparing it and a coherent, verifiable derivation of the results. Whether a private expert report submitted in official proceedings is accepted as sufficient evidence is ultimately decided by the competent authority.
Difference between a fire protection report and a fire protection concept
A fire protection concept sets out all the planned structural, system-based, organisational and defensive fire protection measures for a project. It serves primarily for planning and describes how the relevant protection objectives are to be achieved.
A fire protection report, by contrast, assesses an established or planned condition or a specific technical question. It can review a fire protection concept, assess a deviation, examine the equivalence of a solution or assess the condition of an existing building. Depending on the task, the two document types can overlap in content; however, they do not necessarily serve the same purpose.
Furthermore, a fire protection report neither replaces an official permit nor automatically replaces all other required evidence. It provides a technical basis for decisions, while the legal assessment and the setting of any conditions lie with the competent authority.
Fire protection assessors
Fire protection assessors are specialists who investigate fire protection matters and assess them in writing. Since the title is not uniformly protected in Austria, expertise, professional authorisation, experience, independence and recognition in the procedure concerned must be checked in particular for the specific assignment.
Particularly eligible to prepare them are engineering firms – consulting engineers – with the corresponding specialist authorisation. Their statutory scope of activity expressly includes investigations, inspections, calculations and the preparation of expert reports in the relevant fields. Generally sworn and court-certified experts in the appropriate field, such as fire protection, also hold a particularly distinguished position.
Depending on the specific task, authorised civil engineers, official experts, specialists from fire prevention offices or other demonstrably qualified persons can also prepare reports. Whether a person is recognised for a particular fire protection report ultimately depends on the task, the scope of their authorisation and the requirements of the competent authority or court.
Fire protection experts
Fire protection experts assess technical matters of preventive and defensive fire protection on the basis of special expertise and practical experience. Their scope of work ranges from planning and assessment of the existing situation, through support during the approval and construction phases, to root cause analysis and the technical preservation of evidence.
Depending on their specialisation, they deal with structural, system-based or organisational fire protection. This includes, for example, fire compartments, fire resistance, escape and rescue routes, fire alarm systems, smoke extraction systems, extinguishing systems, firefighting water supply, fire brigade access and in-house fire protection organisation. Their tasks can also include inspecting measures that have been carried out, assessing existing buildings or providing technical support after a fire.
Qualification of a fire protection expert
In Austria, there is no single, generally prescribed training that automatically makes a person a fire protection expert in all areas. The qualification required depends on the task in question. A technical foundation is often provided by technical training in civil engineering, architecture, building services, safety engineering or a comparable field.
Added to this are several years of relevant professional experience and in-depth knowledge of the building codes and building technology ordinances of the federal provinces, the OIB guidelines, ÖNORM standards, European standards and the Technical Guidelines for Preventive Fire Protection. For complex tasks, knowledge of fire protection engineering and international methods, such as those of SFPE or NFPA, may also be required. These international sets of rules are not automatically legally binding in Austria, but can be used to supplement the technical assessment.
Individual courses or personal certificates can demonstrate specific knowledge. However, they do not automatically replace the required professional experience, a statutory professional authorisation or court certification.
Generally sworn and court-certified expert
This is a qualification regulated by law. The person concerned is entered in the Austrian list of court experts for a precisely defined field. In fire protection, the entry is made within the specialist and certification scope provided for this purpose.
Certification is carried out by the president of the competent regional court. Before entry in the list, extensive requirements must be met and the necessary knowledge must be demonstrated in a certification procedure. These include in particular:
- special expertise in the field applied for
- knowledge of procedural law and of the rules governing experts
- ability to properly record findings
- ability to formulate coherent and comprehensible conclusions
- personal suitability and trustworthiness
- sound financial circumstances
- adequate technical and organisational resources
- taking out the prescribed liability insurance
In principle, ten years of responsible work in the field applied for or a related field are required. With relevant university education or higher technical education, five years of professional work may be sufficient. Before entry in the list, an expert's oath is taken, which obliges the expert to investigate carefully, give a complete account of their observations and make an assessment to the best of their knowledge and conscience.
Court-certified experts must act independently, objectively and impartially. They support courts and authorities in answering specialist questions that lie outside general legal or administrative expertise. They can also be commissioned by companies, building owners, insurers or private clients. However, court certification does not automatically make a privately commissioned assessment a court expert report; this requires a specific appointment by the court.
Limited term and recertification
Entry in the list of court experts is initially for five years. It can then be extended by a further five years each time. For this recertification, the statutory requirements must continue to be met. In addition, the previous work as an expert and the further training completed must be set out.
The title “generally sworn and court-certified” therefore indicates verified expertise, practical experience and personal suitability. It must be distinguished from general course certificates or private certificates and may only be used within the scope of the field and certification actually entered in the list.
Fire protection construction supervision
Fire protection construction supervision monitors, within a defined scope of inspection, whether the planned and approved fire protection measures are implemented properly. Its focus is on critical interfaces, concealed systems, changes to plans and complete as-built documentation.
The supervision is based in particular on the approved fire protection concept, submission and construction plans, official decisions, the OIB guidelines applicable in the relevant federal province, relevant ÖNORM standards and TRVB, as well as classification reports, declarations of performance, approvals and manufacturers' installation specifications.
Tasks during construction
The exact scope is determined for each project. Fire protection construction supervision can include, among other things, the following activities:
- checking the detailed design for conformity with the fire protection concept
- coordination of fire protection interfaces between architecture, structural design, building services and the contractors
- site inspections at defined construction phases
- checking fire compartments and building components relevant to fire protection
- support during the installation of fire protection cladding, fire-rated glazing and fire-rated closures
- checking pipe and cable firestops
- assessing the fire protection design of ventilation ducts and fire dampers
- inspection of the arrangement and accessibility of escape and rescue routes
- coordination of fire alarm, alerting, smoke extraction and extinguishing systems
- recording and technical assessment of changes to plans
- documentation of identified deviations and follow-up of their correction
Checks before closing shafts, wall linings, suspended ceilings or installation areas are particularly important. Once construction work is complete, many fire protection installations can no longer be inspected, or only with considerable effort.
Dealing with changes and deviations
During a construction project, room layouts, service routes, materials or technical systems often change. Such adjustments can have a direct impact on fire compartments, escape routes, fire resistance or the interaction of fire protection installations.
Fire protection construction supervision assesses these changes and compares them with the approved documents. Deviations are documented and, together with the designers, site management and contractors, brought to a suitable solution. Significant changes may require an adjustment of the fire protection concept, additional evidence or consultation with the competent authority.
Fire protection documentation
An essential component is the traceable documentation of the measures carried out. This can include site inspection reports, photographic records, lists of defects, product evidence, installation confirmations, markings and test reports. At the end of the project, the relevant documents are often brought together in final fire protection documentation.
Well-organised documentation makes later acceptance inspections, official procedures, recurring inspections and conversions easier. It also shows which systems and products were installed and under what conditions their fire protection performance has been demonstrated.
Fire load calculation
A fire load calculation quantifies the amount of heat theoretically releasable if the combustible materials considered burn completely. Expressed per unit of area, the result is given as the fire load density in MJ/m² and used as an input for fire protection assessments and design calculations.
The fire load is expressed in megajoules. When related to the floor area of the zone under investigation, it is referred to as the fire load density in megajoules per square metre – MJ/m². A high fire load can lead to more intense heat development, a longer fire duration and higher requirements for building components and fire protection installations.
How is the fire load calculated?
For the calculation, the combustible materials present, their mass and their calorific value are recorded. Variable fire loads include, for example:
- Stored goods and packaging
- Plastics, wood, paper and textiles
- Flammable liquids
- Furniture and furnishings
- Cables
- Production and auxiliary materials
In addition, permanently present fire loads from combustible building components, insulation materials, cables, floor constructions or permanently installed technical equipment can be taken into account. Depending on the calculation method, combustion factors, safety coefficients and use-specific parameters are also included.
The result must always be considered in the context of actual use. In addition to the fire load, room height, fire compartment area, type of storage, storage height, escape routes and the fire brigade's options for intervention are important, among other things.
Is a sprinkler system necessary?
A fire load calculation can be an important basis for deciding whether a sprinkler system or other fire protection installation is required. However, it does not decide this question alone. The decisive factor is an overall assessment of legal requirements, building type, use and actual fire risk.
For industrial and storage buildings, OIB Guideline 2.1 as applicable in the relevant federal province must be taken into account in particular. A sprinkler system may be required because of the use, may allow larger main fire compartments or may be used as a compensatory measure within a fire protection concept.
In Austria, TRVB 127 S is particularly relevant for the planning and design of sprinkler systems. In addition to the fire load, this takes into account the use, the fire hazard class, the type of stored goods and packaging, as well as the storage arrangement and storage height. A high fire load therefore does not automatically mean that any sprinkler system is suitable. The system must be planned and dimensioned according to the specific fire hazard.
Other applications
Fire load calculations can also be used for dimensioning smoke and heat extraction systems, determining firefighting water demand or for fire protection safety evidence. In fire protection engineering methods, the fire load can form a basis for fire and smoke simulations and for assessing the thermal stress on building components.
The calculation applies only to the assumed use and the defined storage conditions. If materials, storage quantities, storage heights or production processes change significantly, it must be checked whether the previous fire load calculation is still applicable.
Fire protection renovation
Fire protection renovation serves to specifically improve the fire protection of an existing building or commercial facility. This involves remedying identified defects, upgrading existing installations and adapting the fire protection measures to the actual use and the legally relevant requirements.
Renovation does not automatically mean that the entire building must be brought completely up to new-build standard. Which requirements apply depends on the lawfully existing building, the approval status, the nature and scope of the planned changes and the regulations of the relevant federal province.
When is renovation required?
A fire protection renovation may be prompted by inspections by the authorities, official fire inspections, recurring inspections of commercial facilities or technical surveys of the existing building. Conversions, extensions, changes of use and altered storage or production conditions can also make a new fire protection assessment necessary.
Typical renovation issues are:
- missing or insufficient fire compartments
- unsuitable or damaged fire-rated closures
- defective pipe and cable firestops
- insufficient escape and rescue routes
- outdated fire alarm, alerting or extinguishing systems
- missing or insufficient smoke extraction
- increased fire loads
- deviations from the approved condition
- missing inspection, maintenance or existing-building records
Survey of the existing building and renovation concept
The first step is a fire protection survey of the existing building. This involves examining the building, its actual use, existing approvals, official decisions, plans and fire protection installations. It is then checked whether the actual condition corresponds to the lawfully existing building and the requirements relevant to the property.
On this basis, a renovation concept can be drawn up. It describes the deviations identified, the protection objectives to be achieved and the necessary structural, system-based or organisational measures. The work can be prioritised according to risk and urgency and divided into renovation phases coordinated over time.
In certain cases, structural measures can be supplemented or partially compensated for by other suitable measures. However, such a deviation is only justifiable if the required level of protection is demonstrated coherently and traceably and the solution is permissible in the procedure concerned or recognised by the competent authority.
What requirements apply to existing buildings?
Austrian building law falls within the competence of the federal provinces. The decisive factors are therefore the relevant building code, the building technology ordinance and the edition of the OIB guidelines declared binding there. In addition, permit decisions, ÖNORM standards, TRVB and provisions of trade law and employee protection law may have to be taken into account.
OIB guidelines 2, 2.1, 2.2 and 2.3, 2023 edition, each contain a provision for construction work on existing buildings. According to this, in the case of changes affecting existing parts of a structure, deviations from current requirements may be permissible if the original level of requirements of the lawfully existing building is not worsened. However, this provision only applies in conjunction with the implementation of the relevant OIB edition in provincial law.
This does not give rise to unrestricted grandfathering. Whether existing constructions are still permissible must be checked for the specific property. Unapproved alterations, a change of use or a deterioration in the previous safety level may make an adjustment necessary.
Special feature of commercial facilities
For approved commercial facilities, the authority can, under the special conditions of § 79 Abs. 3 GewO 1994, order the submission of a renovation concept. This concerns cases in which the necessary protection of the interests covered by the Austrian Trade Act could only be achieved through measures that would change the essential nature of the approved commercial facility.
This case, regulated by law, must be distinguished from a fire protection renovation that is voluntary, required under building law or carried out because of individual defects.
Renovation based on protection objectives
Properly planned renovation considers not only individual defects but also the interaction of all fire protection measures. This allows investments to be targeted and disproportionate or technically unsuitable individual measures to be avoided.
For complex existing buildings, recognised fire protection engineering methods can be used, such as fire and smoke simulations, evacuation calculations or computational evidence for building components. International standards and methods from SFPE or NFPA can be taken into account as a supplement if this is technically suitable for the project and aligned with the Austrian requirements and the competent bodies. This does not create any automatic legal obligation.
Implementation should be supported by specialists and documented in a traceable manner. Depending on the procedure, certain evidence, inspections, acceptance inspections or confirmations may also be mandatory.
Inspection engineers
Inspection engineers check, within a defined inspection assignment, that design and execution conform to the approval documents and technical requirements. The title, authorisation, independence and scope of inspection are not uniformly regulated in Austria and must be derived from the relevant provincial law or procedure.
The term “inspection engineer” is not uniformly regulated in Austria for all federal provinces and inspection tasks. Which qualification is required and which powers exist depends on the relevant provincial law, the official procedure, the type of facility and the specific inspection assignment.
Tasks in fire protection
Fire protection inspections can begin as early as the planning documents and extend throughout construction until completion. Typical activities are:
- checking conformity with permit decisions and approved plans
- checking building components relevant to fire protection
- inspection of fire compartments and fire-rated closures
- checking pipe and cable firestops
- inspection of escape and rescue routes
- checking the construction products used and the evidence of their usability
- documentation of deviations and workmanship defects
- checking that defects have been remedied
- preparation of inspection reports and confirmations
Checks of building components that will later be concealed or no longer accessible are particularly important. These include, for example, firestops in shafts, fire protection cladding or connections within suspended ceilings.
Inspection engineer under the building code
An expressly statutory function exists, for example, in Vienna. Under § 127 of the Vienna Building Code, an inspection engineer must in principle be appointed for certain construction projects requiring a permit. Civil engineers (Ziviltechniker) or generally sworn and court-certified experts in the relevant field may act as inspection engineers there.
The inspection engineer must be independent of the building applicant and the responsible contractor. They carry out the statutory inspections and checks during construction and report any deviations found from the approved building plans to the building authority. The prescribed evidence of these inspections must be submitted with the notice of completion.
This Viennese rule cannot simply be applied to the whole of Austria. Other federal provinces have different titles, responsibilities and requirements for monitoring construction.
Inspection of fire protection systems
The work of an inspection engineer under building law must be distinguished from the inspection of special fire protection systems. Fire alarm systems, sprinkler systems, smoke and heat extraction systems, pressurisation systems or emergency lighting are each subject to their own technical regulations and inspection requirements.
Depending on the legal provision, official decision or applicable standard, an inspection by authorised specialists, civil engineers, engineering firms, court-certified experts or accredited inspection bodies may be required. General work as an inspection engineer therefore does not automatically entitle a person to carry out the acceptance inspection of every fire protection system.
Qualification and independence
An inspection engineer needs technical training appropriate to the task, relevant professional experience and precise knowledge of the applicable building regulations, OIB guidelines, ÖNORM standards, TRVB and approval documents. Traceable inspection documentation and the ability to assess deviations technically are equally important.
Depending on the procedure, special authorisations, court certification or accreditation may be required. In addition, independence rules may stipulate that design, execution and inspection must not be carried out by the same person or organisation.